Animas River & Williams Arroyo Bank Stabilization
Animas Riverbank Stabilization
Phase 1 involves the riverbank stabilization of the Animas River at the south pedestrian bridge on the Hartman Park side.
• Project awarded. But construction delayed until Winter 2025.
• December / January construction.
Williams Arroyo
Continued floods and heavy stormwater run-off has begun to erode the arroyo's banks which is undercutting the parking lot sidewalk and YAFL field at Hartman Sports Complex.
Phase 1. Damaged Parking Lot Area
• Construction completed.
Phase 2. Arroyo along YAFL Field
• Design underway.
Last Updated 12/17/2025