Animas River & Williams Arroyo Bank Stabilization

Animas Riverbank Stabilization

Phase 1 involves the riverbank stabilization of the Animas River at the south pedestrian bridge on the Hartman Park side.
  • • Project awarded.
  • • Permit application completed, waiting on Army Corp of Engineer approval.
  • • August / September construction.


  • Williams Arroyo

    Continued floods and heavy stormwater run-off has begun to erode the arroyo's banks which is undercutting the parking lot sidewalk and YAFL field at Hartman Sports Complex.
    Phase 1. Damaged Parking Lot Area
  • • Permit completed.
  • • Out to bid, closes May 7th.
  • • Pre-bid meeting done.


  • Phase 2. Arroyo along YAFL Field
  • • Design underway.



  • Last Updated 5/2/2024
    River Bank Stabilization