South Aztec Water System

Phase 1. Water System Design and Engineering.

  • • City has contracted an engineer firm to prepare Preliminary Engineering Report (PER) and then move into complete engineering design once funding is obtained.


  • Phase 2. Reconstruction of Bladder Tank.

  • • Funding has been aquired.
  • • Bladder tank wil be replaced with above gorund tank storage.


  • Phase 3. Reconstruction of 12" water line from Aztec to Bloomfield.

  • • Seeking funding assistance.
  • • Inquiring on MOU with Bloomfield.


  • Phase 4. Upgrading of service lines within the South Aztec water service area.

  • • Seeking funding assistance.



  • Last Updated 5/2/2024