PROJECTS

Project 1. Aztec Disc Golf Course
Add three additional baskets to the 6-hole course. Involves digging holes and mounting the basket post in concrete. T-box frames will be constructed with 2x4s in the size of 4ft x 6ft. Excavate the turf to 3 inches down so that the T-box frames will sit at ground level surface. Fill frames with crusher fines.

Project 2. RV Parking Facilities
Clear areas for picnic tables and install five picnic tables. Install new post & cabling (560 feet / 28 posts).

Alternate 1. Riverside Post & Cabling Improvements
Identify posts that are not capped. Fill each post 3/4 full with sand, then pour concrete remaining 1/4 for permanent cap.

Alternate 2. Animal Shelter Dog Park Amenities
Hand excavate 2 ft deep water line trench. Install PVC water line and connect to frost-free faucet. Excavate pit to install metal water trough for holding water.

Alternate 3. Rio de Animas Trail Signage
This project will hinge on whether City staff is able to manufacture the sign frames. If made, then YCC will be responsible for installation.

Alternate 4. Rio de Animas Parking Lot and Trail Improvements.
Clear vegetation. Compact and spread gravel.